Insurance company office

Project: feasibility study with support in the detection of the building, architectural and installation design, support to the work supervision and…

BPER Bank branches

Project: branches refurbishment and layout renovation Location: various location Dimension: 90 sqm - 200 sqm Year: 2016 - 2018 In 2016, WiP started a close…

General Consulate of Peru

Project: architectural design and installation project Location: Milan Dimension: 1200 sqm Year: 2016

Snam Offices

Project: refurbishment and final proposal Location: San Donato Milanese (MI) Dimension: 700 sqm Year: 2015

WiP Office

Project: office Location: San Donato Milanese (MI) Dimension: 400 sqm Year: 2015

Space Planning

Location: Maputo Type: Office layout and refurbishment Dimensions: 4000sq.m Timescale: 2013-in progress

Snam Rete Gas Centre Verbania

Progetto: Requalification of existing building and enlargment Location: Verbania (NO) Dimension: 4.1150 mq Year: 2011

Magnoni Foundation

Project: Office layout and refurbishment of the headquarters Location: Milano Dimension: 150 mq Year: 2008

Office building

Project: Requalification of existing building and office layout Location: San Donato Milanese (MI) Dimension: 1.000 mq Year: 2004-2007